GRESHAM-BARLOW SCHOOL DISTRICT - POWELL VALLEY ELEMENTARY SCHOOL
GRESHAM, OR
Size: 60,280 SF
Axis Design Group was hired to provide architectural services associated with general building construction projects; renovations and repairs in response to the passing of the bond measure in November 2016. The renovation of Kelly Creek Elementary School built in the 1990’s included addressing play field path and storm water upgrades, replacement of E.I.F.S. on the building, roofing replacement, hardware and security upgrades, new secure front entry vestibule, new finishes; fire alarm system, PA/clock upgrades; and connecting existing e-power generator to buildings communication systems. Axis played a key role in the coordination, documentation, and specialized detailing of the new roofing assemblies with all the roof mounted HVAC equipment and mechanical screens for the project. Roof scope included: new built-up bituminous roofing membrane and asphalt composition shingles, associated flashings, dome/guard collar assemblies, conductors, scuppers, curbs for mechanical equipment, and copings.