ALICE OTT MIDDLE SCHOOL
david douglas school district Portland, OR
Area of Work/Building Size: 94,939 S.F.
Completed: June 2025
Axis Design Group was hired to provide architectural to address a series of site, building envelope, and interior improvements aimed at improving safety, functionality, and long-term performance. Site work included select parking lot, drive loop, and sidewalk replacement, along with new site and entry lighting coordinated between Architectural, Civil, and Electrical disciplines. Upgrades to the main entry vestibule included new exterior doors, a new interior storefront wall, and pathways for an updated access control system, including cameras and controlled openings in coordination with the district’s security consultant. Interior work also included alterations to the main office, such as a new transaction counter window and coiling counter door, redesigned reception counter, and an upgraded administration entry door.